| This checklist has been complied to address most common problems encountered during the installation of the Protect-All flooring in a commercial kitchen application. The most important item is #6. It is vital that all drains be installed properly and that the concrete substrate is smooth and properly sloped to drains. This is the responsibility of the customer project manager or the construction company company.
Please review this list carefully and if you have any question, please call (919) 852-5279. R. Dale Brock, Director of Operations
|
A
signed form MUST be returned to B &
H Commercial Services before the flooring
installation can be scheduled. You
can download this form by clicking
here.
SUBSTRATE FLOOR CONDITION:
1) CONCRETE SLAB MUST BE FULLY CURED,
DRY AND MEET HYDROSTATIC MOISTURE CONDITIONS
OF NO MORE THAN 3 POUNDS PER 1000 SQUARE
FEET.
2) SUBSTRATE SHOULD BE GRADED (SLOPED)
TO DRAINS AS NECESSARY TO MEET LOCAL HEALTH
DEPARTMENT REQUIREMENTS.
3) CONCRETE FLOORS MUST BE LEVEL EXCEPT
FOR DRAIN SLOPE AS RREQUIRED AND CLEARED
OF DEBRIS AND EQUIPMENT.
4) THE USE OF MUD SET IS NOT RECOMMENDED.
CONTACT B & H DIRECTLY FOR REQUIREMENTS
AND APPROVALS IF MUDSET MUST BE USED.
INSTALLATION AREA:
1) MUST BE FULLY ENCLOSED AND WATER TIGHT.
2) ROOF AND WALLS MUST BE FULLY CONSTRUCTED
AND SECURED.
DRAINS:
1) MUST BE CLEARLY VISIBLE, ACCESSIBLE
AND FREE OF DEBRIS.
2) ALL SQUARE, ROUND AND TROUGH FLOOR
DRAINS ARE TO BE INSTALLED 1/8”
ABOVE SUBSTRATE LEVEL TO ACCOMMODATE FLOORING
MATERIAL.
3) ARE TO BE INSTALLED HORIZONTAL TO SUBSTRATE
HEIGHT IE: DRAINS SHOULD NOT BE INSTALLED
AT AN ANGLE TO FLOOR SURFACE.
4) ARE TO BE IN WORKING ORDER AND DRAIN
PROPERLY.
5) ALL DRAIN COVERS AND ACCOMPANYING HARDWARE
MUST BE PRESENT AND UNDAMAGED. WALL CONDITIONS:
1) WALLS MUST BE COMPLETELY ENCLOSED WITH
SHEETROCK FULLY INSTALLED EXTENDING TO
SUBSTRATELEVEL.
2) FRP MUST BE FULLY INSTALLED AND EXTEND
TO THE SUBSTRATE LEVEL.
3) CERAMIC TILE WALLS MUST BE COMPLETELY
INSTALLED AND EXTEND TO THE SUBSTRATE
LEVEL.
4) STAINLESS WALLS ARE TO BE COMPLETELY
SECURED.
DOORS:
1) DOOR FRAMES MUST BE COMPLETELY INSTALLED
2) DOORS IN AREAS OF NEW FLOOR INSTALLATION
SHOULD BE INSTALLED TO ALLOW FOR A MINIMUM
OF ½” TO ACCOMMODATE FLOORING
MATERIAL AND STAINLESS TRANSITION.
COOLERS & FREEZERS: (IF SPECIFIED
FOR INSTALLATION)
1) MUST BE FULLY ASSEMBLED AND INSTALLED.
2) MUST BE WATER TIGHT AND COMPLETELY
SEALED.
3) CONCRETE FLOOR SURFACES MUST MEET MINIMUM
REQUIREMENTS ABOVE FOR SUBSTRATE CONDITIONS.
4) SHOULD NOT BE OPERATED 48 HOURS PRIOR
TO OR IMMEDIATELY AFTER NEW FLOOR INSTALLATION.
BAR AREAS: (IF SPECIFIED FOR INSTALLATION)
1) BARS SHOULD BE COMPLETELY INSTALLED
PRIOR TO FLOORING INSTALLATION.
PLUMBING:
1) PLUMBING INSTALLATION MUST BE COMPLETED
PRIOR TO THE ARRIVAL OF THE FLOORING CREW.
2) PLUMBING AND EQUIPMENT PIPE CONNECTIONS
ARE TO BE DISCONNECTED AND CAPPED PRIOR
TO THE COMMENCEMENT OF FLOORING INSTALLATION.
GAS LINES:
1) ARE TO BE INSTALLED 9” ABOVE
SUBSTRATE LEVEL.
2) ARE NOT TO BE ANCHORED TO FLOORING
AFTER FLOORING COMPLETION OR FLOOR WARRANTY
MAY BE VOIDED.
WASTE REMOVAL:
1) CUSTOMER MUST PROVIDE ADEQUATE WASTE
REMOVAL CONTAINERS (DUMPSTERS) FOR FLOORING
MATERIALS AND DEBRIS TO BE REMOVED FROM
THE JOB SITE.
WATER ACCESS:
1) HOT (IF AVAILABLE) AND COLD WATER ACCESS
WITH STANDARD WATER HOSE CONNECTIONS.
POWER ACCESS:
1) ELECTRICAL POWER DEDICATED TO FLOORING
CREW AND AVAILABLE DURING FLOORING INSTALLATION
WITH A MINIMUM OF 3 SEPARATE 20 AMP ELECTRICAL
OUTLETS REQUIRED.
2) A POWER GENERATOR OR GENERATORS MEETING
THE ABOVE REQUIREMENTS MUST BE PROVIDED
BY THE
CUSTOMER IF ADEQUATE BUILDING POWER IS
NOT AVAILABLE.
SITE ACCESS:
1) CUSTOMER WILL INSURE B & H INSTALLATION
CREW HAS UNRESTRICTED ACCESS TO THE JOBSITE
AS SCHEDULED.
2) CUSTOMER MUST NOTIFY B & H A MINIMUM
OF 48 HOURS IN ADVANCE SHOULD THERE BE
SITE ACCESS LIMITATIONS.
MATERIAL DELIVERY:
1) BASED ON START DATE OF INSTALLATION,
CUSTOMER MAY BE ASKED TO RECEIVE DELIVERY
OF AND UNLOAD ALL FLOORING MATERIALS INCLUDING:
a) PROTECT-ALL VINYL FLOORING MATERIAL
& ADHESIVES.
b) STAINLESS STEEL FIXTURES AND ACCESSORIES.
(A weekend starting date may require a
coordinated effort between customer and
B & H for material delivery).
STORAGE:
1) PROTECT-ALL FLOORING MATERIAL IS TO
BE LAID FLAT WHILE STORED.
2) PROTECT-ALL FLOORING MATERIAL, STAINLESS
FIXTURES, ADHESIVES AND ACCESSORIES ARE
TO BE STORED IN A DRY AND SECURE LOCATION.
3) PRODUCT LOSS OR DAMAGE IS THE RESPONSIBILITY
OF THE CUSTOMER.
CONTACT LIST:
1) CUSTOMER WILL PROVIDE B & H WITH
A WRITTEN CONTACT LIST AND POINT OF CONTACT
(POC) AUTHORIZED TO SIGN ANY CHANGE ORDERS
A MINIMUM OF 2 WEEKS PRIOR TO PROJECT
START.
2) CONTACT LIST WILL INCLUDE:
a) GENERAL CONTRACTOR PHONES & ADDRESS
b) PROJECT MANAGER (INCLUDING CELL PHONE
#)
c) JOB SUPERINTENDENT (INCLUDING CELL
PHONE #) ASSESSMENTS:
1) ASSESSMENTS, IF INCURRED, ARE BILLED
AT A RATE OF $50.00 PER HOUR PER MAN TO
A MAXIMUM OF $1000.00 PER DAY.
2) ASSESSMENTS MAY BE INCURRED FOR THE
FOLLOWING:
a) CUSTOMER HAS NOT MET CONSTRUCTION CHECKLIST
ITEMS PRIOR TO ARRIVAL OF THE FLOORING
CREW CAUSING A DELAY IN JOB START.
b) CONSTRUCTION PROJECT IS BEHIND SCHEDULE
AND CUSTOMER DOES NOT NOTIFY B & H
OF NEED TO RESCHEDULE A MINIMUM OF 6 DAYS
PRIOR TO ARRIVAL OF FLOORING CREW.
c) HEAVY RAINS, WINDS OR NATURAL DISASTERS
CAUSE FLOODING OR STRUCTURAL DAMAGE TO
THE BUILDING CAUSING B & H TO BE UNABLE
TO WORK OR COMPLETE THE PROJECT ON TIME.
SPECIAL CONSIDERATIONS:
B & H IS TO BE ADVISED IN WRITING
OF SPECIAL CONSIDERATIONS OR UNUSUAL
REQUIREMENTS ON THE JOBSITE PRIOR TO ACCEPTANCE
OF PROPOSAL (QUOTATION) SUCH AS:
1) LABOR UNION CONCERNS
2) FREIGHT DELIVERY& UNLOADING RESTRICTIONS
3) BUILDING SECURITY
4) PARKING RESTRICTIONS
5) SITE ACCESS RESTRICTIONS
(FAILURE TO DISCLOSE ANY OF THE ABOVE
SPECIAL CONSIDERATIONS PRIOR TO ACCEPTANCE
OF PROPOSAL BY BOTHPARTIES WILL SUBJECT
PROPOSAL TO BE NULL AND VOID REQUIRING
A NEW PROPOSAL BE SUBMITTED FORACCEPTANCE).
ASDFASDF
| Please
Note:
The General Contractor Project Superintendant
Is Repsonsible For Pressure Washing
The Floor Immediately Prior To Kitchen
Equipment Delivery. Construction
Grime And Dirt Should Not To Be
Present When Operator Takes Delivery
Of Location. |
|